Eaton Powerware 9355-12-N-8-32x9Ah-MBS Bruksanvisning

Eaton UPS Powerware 9355-12-N-8-32x9Ah-MBS

Läs gratis den bruksanvisning för Eaton Powerware 9355-12-N-8-32x9Ah-MBS (50 sidor) i kategorin UPS. Guiden har ansetts hjälpsam av 2 personer och har ett genomsnittsbetyg på 4.7 stjärnor baserat på 1.5 recensioner. Har du en fråga om Eaton Powerware 9355-12-N-8-32x9Ah-MBS eller vill du ställa frågor till andra användare av produkten? Ställ en fråga

Sida 1/50
Users Guide
UPS 8 – 15 kVA,
400 V 50/60 Hz output
(3-phase input/output)
©2007 Eaton Corporation
All Rights Reserved
The contents of this manual are the copyright of the publisher and
may not be reproduced (even extracts)
unless permission granted.
Every care has been taken to ensure the accuracy of
the information contained in this manual, but no liability
can be accepted for any errors or omission. The right
to make design modifications is reserved.
UPS 8 – 15 kVA, 400 V 50/60 Hz
User’s Guide 1023625 revision C
Contents
1. Safety instructions ............................................................................................................................................................. 4
Audience .............................................................................................................................................................................. 4
CE marking ........................................................................................................................................................................... 4
User precautions ................................................................................................................................................................. 4
Environment ......................................................................................................................................................................... 5
Inquiries ................................................................................................................................................................................ 5
2. Mechanical installation .................................................................................................................................................... 6
Delivery check ..................................................................................................................................................................... 6
Unpacking and visual inspection ..................................................................................................................................... 6
3. Planning before installation ............................................................................................................................................. 8
4. Cabinet installation ............................................................................................................................................................ 9
Maintenance bypass switch ............................................................................................................................................. 9
Transformer option ............................................................................................................................................................. 11
External battery cabinet option ........................................................................................................................................ 12
Battery racks ....................................................................................................................................................................... 12
5. Electrical installation ........................................................................................................................................................ 13
Power cables and protective fuses ................................................................................................................................. 14
Wiring procedure ................................................................................................................................................................ 15
External Battery Cabinet (EBC) installation procedure ................................................................................................ 18
6. Software and connectivity ................................................................................................................................................ 20
Communication cables ....................................................................................................................................................... 20
Connection to the standard RS 232 port (X53)................................................................................................................ 20
LanSafe software ........................................................................................................................................................... 21
External control connections ............................................................................................................................................ 21
Emergency Power Off (EPO) ......................................................................................................................................... 23
Relay outputs ................................................................................................................................................................... 23
Programmable signal inputs ......................................................................................................................................... 23
XSlot communication (option) ........................................................................................................................................... 24
SNMP/Web Module (optional) ..................................................................................................................................... 24
AS400 Relay Module (optional) .................................................................................................................................... 25
Single Serial Port Module (optional) ........................................................................................................................... 25
Modus/Jbus Module (optional) .................................................................................................................................... 25
7. User operations ................................................................................................................................................................... 26
Display functions ................................................................................................................................................................. 26
User Settings ....................................................................................................................................................................... 27
Configuring user settings .............................................................................................................................................. 29
Changing language ........................................................................................................................................................ 29
Changing charging current ........................................................................................................................................... 29
Using relay outputs ........................................................................................................................................................ 29
Normal start-up ................................................................................................................................................................... 30
Battery start-up ................................................................................................................................................................... 30
Start-up after EPO ............................................................................................................................................................... 30
Shutdown ............................................................................................................................................................................. 31
8. Maintenance ....................................................................................................................................................................... 32
Regular service/intervals ................................................................................................................................................... 32
Batteries ........................................................................................................................................................................... 32
Cooling fan ....................................................................................................................................................................... 33
LED Indicators ..................................................................................................................................................................... 33
Maintenance bypass switch (MBS) operation .............................................................................................................. 33
Turn UPS from normal mode to mechanical bypass ................................................................................................ 34
Turn UPS from mechanical bypass to normal mode ................................................................................................ 35
9. Parallel systems ................................................................................................................................................................. 37
Overview ............................................................................................................................................................................... 37
Tie cabinets .......................................................................................................................................................................... 38
XSlot Hot Sync card: installing and wiring ..................................................................................................................... 42
Parallel operations .............................................................................................................................................................. 43
10. Recycling the used UPS or batteries ............................................................................................................................. 45
11. Dimensional drawings ..................................................................................................................................................... 47
12. Technical data ..................................................................................................................................................................... 48
Standards ............................................................................................................................................................................ 48
Environment ......................................................................................................................................................................... 48
Mechanical configuration ................................................................................................................................................. 48
Characteristics .................................................................................................................................................................... 48
AC input ................................................................................................................................................................................ 49
DC circuit .............................................................................................................................................................................. 49
AC output .............................................................................................................................................................................. 49
13. Warranty ............................................................................................................................................................................... 50

Produktspecifikationer

Varumärke: Eaton
Kategori: UPS
Modell: Powerware 9355-12-N-8-32x9Ah-MBS
Färg på produkten: Zwart
Vikt: 5700 g
Bredd: 198 mm
Djup: 490 mm
Höjd: 538 mm
Snäll: PC
LED-indikatorer: Ja
Vormfaktor: Midi Tower
Antal USB 2.0-portar: 2
Lämplig för: Gamen
Ljudingångar: Ja
Ljudutgång: Ja
Material: SPCC
Antal portar USB 3.2 Gen 1 (3.1 Gen 1) Typ A: 2
Färg på belysningen: Multi
Strömförsörjning ingår: Nee
Antal 2,5" fack: 4
Antal 3,5" fack: 2
Hårddiskstorlekar som stöds: 2.5, 3.5 "
Antal expansionsplatser: 7
Exponering: Ja
Moderkortsformfaktorer som stöds: ATX, Micro ATX, Mini-ITX
Sidofönster: Ja
Maximal CPU-kylarhöjd: 160 mm
Maximal grafikkortslängd: 390 mm
Maximal PSU-längd: 180 mm
Maximalt antal främre fläktar: 2
Främre fläktar som stödjer diametrar: 120,140 mm
Toppfläktar som stöder diametrar: 120 mm
Max antal bakre fläktar: 1
Bakre fläktar stödjer diametrar: 120 mm
Dimensioner för främre kylarfläkt: 120,240 mm
Stöd övre radiatorfläktstorlek: 120,240 mm
Dimensioner för bakre kylarfläkt: 120 mm
Fläkthastighet: 10000 RPM

Behöver du hjälp?

Om du behöver hjälp med Eaton Powerware 9355-12-N-8-32x9Ah-MBS ställ en fråga nedan och andra användare kommer att svara dig