EMOS ZN1310 Bruksanvisning
EMOS
Inte kategoriserad
ZN1310
Läs gratis den bruksanvisning för EMOS ZN1310 (16 sidor) i kategorin Inte kategoriserad. Guiden har ansetts hjälpsam av 5 personer och har ett genomsnittsbetyg på 4.9 stjärnor baserat på 3 recensioner. Har du en fråga om EMOS ZN1310 eller vill du ställa frågor till andra användare av produkten? Ställ en fråga
Sida 1/16

1548131000_31-ZN1310_00_01 74 × 105 mm
ZN1310
GB LED Emergency Downlight
CZ LED nouzové svítidlo
SK LED núdzové svietidlo
PL Oprawa awaryjna LED downlight
HU LED vészvilágító lámpatest
SI Zasilna LED svetilka
RS|HR|BA|ME Protupanična LED svjetiljka sa svjetlom
usmjerenim prema dolje
DE LED Notleuchte
UA Світлодіодний аварійний світильник
RO|MD LED lampă de urgență
LT LED avarinis šviestuvas
LV LED avārijas gaismeklis
EE Alla suunatud LED-avariivalgusti
BG LED aварийно осветително тяло
за вграждане
www.emos.eu

2
A
B
ø 120 mm
5
1 2
2
1 2
3

3
GB | LED Emergency Downlight
Voltage: 220–240 V AC
Power consumption: 3 W
Charge time: 24 hours
Emergency duration: 3 hours
Operation: Non-maintained
Lumen output: 240 lm
Ingress Protection: IP20
Normal Operation: The red LED indicator light on means battery charging. Green LED indicator on means
battery is fully charged. LED indicator will icker in red in battery is disconnected.
Battery: Battery should be replaced when the required duration is no longer achieved. To avoid any damage
to the xture and ensure its performance, the battery should be replaced with same brand and type.
Test Switch: Press the test button, LED indicator will turn o and the sign will be illuminate from its
battery pack. The light source of this luminaire is not replaceable; when the light source reaches its
end of life the whole luminaire shall be replaced.
Installation instructions
A
Switch o the mains supply before installation.
1. Make a ø 120 mm size cut out hole in the ceiling. Thickness of mounting plate can be in the range
10 to 20 mm.
2. Take o the front cover and change the lens if needed.
3. Take o the battery cover and connect the battery.
4. Connect power supply.
5. Rotate spring and recessed xture into the cut out hole.
Turn on power supply.
B
Switch o the mains supply before installation.
1. Screw the surface mounting kit ZN1311 to the ceiling and proceed as gure 2–4 in installation
method A.
2. Snap downlight in the surface mounting kit.
Turn on power supply.
WARNING
• Luminaire is suitable entirely for xed mounting.
• The luminaire can be connected only to the electric distribution network, whose installation and
protection complies with the applicable standards.
• Before any manipulation or servicing of the luminaire disconnect the luminaire from AC power. This
operation can be carried out only by an authorized person.
• In case of any damage to any part of the luminaire, don’t use it.
• LED chips inside the luminaire are not replaceable.
• Don’t change inner wiring of the luminaire.
EMOS spol. s r. o. declares that the ZN1310 is in compliance with the essential requirements and
other relevant provisions of Directive. The device can be freely operated in the EU. The Declaration of
Conformity can be found at http://www.emos.eu/download.
CZ | LED nouzové svítidlo
Napětí: 220–240 V AC
Příkon: 3 W
Doba nabíjení: 24 hodiny
Doba zálohy: 3 hodiny
Režim provozu: Pohotovostní
Světelný tok: 240 lm
Stupeň krytí: IP20
Produktspecifikationer
Varumärke: | EMOS |
Kategori: | Inte kategoriserad |
Modell: | ZN1310 |
Behöver du hjälp?
Om du behöver hjälp med EMOS ZN1310 ställ en fråga nedan och andra användare kommer att svara dig
Inte kategoriserad EMOS Manualer
14 Mars 2025
1 Januari 2025
31 December 2025
15 December 2024
14 December 2024
14 December 2024
14 December 2024
14 December 2024
14 December 2024
14 December 2024
Inte kategoriserad Manualer
- DeWalt
- Springfree
- Paladin
- Doona
- Delonghi
- Adviti
- Genki Instruments
- Vanish
- Siedle
- Sagemcom
- Yeyian
- Husky
- Axxess
- Infosec
- Mousetrapper
Nyaste Inte kategoriserad Manualer
9 April 2025
9 April 2025
9 April 2025
9 April 2025
9 April 2025
9 April 2025
9 April 2025
9 April 2025
9 April 2025
9 April 2025