Gossen Metrawatt Profitest Intro Bruksanvisning
Gossen Metrawatt
Mätinstrument
Profitest Intro
Läs gratis den bruksanvisning för Gossen Metrawatt Profitest Intro (62 sidor) i kategorin Mätinstrument. Guiden har ansetts hjälpsam av 13 personer och har ett genomsnittsbetyg på 4.5 stjärnor baserat på 7 recensioner. Har du en fråga om Gossen Metrawatt Profitest Intro eller vill du ställa frågor till andra användare av produkten? Ställ en fråga
Sida 1/62

Operating Instructions
PROFITEST INTRO
Tester, DIN VDE 0100-600 / IEC 60364-6 3-349-840-03
1/6.15
Optional Z503K

2GMC-I Messtechnik GmbH
LCD Panel
Setup Menu
Rotary
Selector Switch
Guide for
Carrying Strap
Guide for
Carrying Strap
MEM:Key for
memory functions
ESC: Return from
submenu /
Activate instrument
from standby state
Control Panel
Fixed Function Keys
MAINS/NETZ LED
→ see below
IΔN:Triggering key /
compensation (offset)
HELP: Access context
sensitive help
START:Switch on /
start measurement
Softkeys
• Parameter selection
• Limit value specification
• Entry functions
• Memory functions
LED Indications (see also section 16)
LED Case A LED Case B
LCD Case A LCD Case B
Function – Cause
A Lights up green: Correct connection, measurement enabled
B Blinks green: Neutral conductor not connected, measurement enabled
A
Lights up orange:
2 different phases active (no neutral conductor at mains), meas. enabled
B Blinks red: IΔN, IF, ZL-PE, ZL-N, RE: No line voltage or PE interrupted
C Lights up red:RINS and RLO: Interference voltage detected, measurement disabled
– UIΔ, UIΔN:
Touch voltage > 25 or 50 V, measurement disabled: display: U.PE > UL!
–IΔN: During the tripping test with IN, the RCD is not tripped within 400 ms
(1000 ms for selective RCCBs of type RCD S).
–IF : With rising residual current, the RCD is not tripped before reaching IN.
– After safety shutdown
–RLO
:
The permissible (selected) limit value has been exceeded.
–RINS, RE(INS)
:
The permissible (selected) limit value has been exceeded.
Mains
Green
Mains
Blinks green
N
PE
L
N
PE
L
x
Mains
Orange
Mains
Blinks red
N
PE
L
N
PE
L
N
PE
L
x
LIMIT
Red
Limit LED
→ see below

GMC-I Messtechnik GmbH 3
LN
PE
L1L3L2
n.c.
Z550A Option
Battery Holder
Battery Compartment Lid
Battery Holder
Contacts
Battery
Contact
Spring
user interface
Batteries, Fuses
Measuring Connections
!
RS 232
Charger Socket, Interfaces
These connections are located under a protective rubber flap.
a b
Battery
Socket for Z502R charger
Caution!
Make sure no batteries are inserted
before connecting the charger.
The test instrument must remain off
during the charging process.
Fuses
Inserting the Battery Holder (side view)
USB Slave
for Connection to PC
Port for connecting Barcode/RFID reader
Assignment of Keys to Device or Remote Control
Measuring Function At Device Via Remote Control At Device Via Remote Control
Start measurement Tripping test
IΔN
IF
Measuring function Start measurement OFFSET
ZL-PE, ZL-N
RE
RLO, ΔU
RINS
Measurement Key for Measuring
Measuring Point Illumination
Point Illumination
Safety Collar
Test probe
Test Probe with Remote Control, Option Z550A
Optional Z503K
n.c.
Z503L
Compartment
Compartment Lid
Key
Produktspecifikationer
Varumärke: | Gossen Metrawatt |
Kategori: | Mätinstrument |
Modell: | Profitest Intro |
Behöver du hjälp?
Om du behöver hjälp med Gossen Metrawatt Profitest Intro ställ en fråga nedan och andra användare kommer att svara dig
Mätinstrument Gossen Metrawatt Manualer
22 Februari 2025
13 September 2024
13 September 2024
13 September 2024
13 September 2024
12 September 2024
12 September 2024
12 September 2024
12 September 2024
12 September 2024
Mätinstrument Manualer
- Greenlee
- Brandson
- AS - Schwabe
- Milwaukee
- Bushnell
- Benning
- GMC Instruments
- Hameg
- Nieaf-Smitt
- Megger
- Ideal Networks
- Trotec
- Leica
- Skil
- Metrel
Nyaste Mätinstrument Manualer
8 Januari 2025
7 Januari 2025
27 Oktober 2024
17 September 2024
17 September 2024
15 September 2024
15 September 2024
15 September 2024
15 September 2024
15 September 2024