CDA KA71SS Bruksanvisning
Läs gratis den bruksanvisning för CDA KA71SS (4 sidor) i kategorin Sjunka. Guiden har ansetts hjälpsam av 7 personer och har ett genomsnittsbetyg på 4.9 stjärnor baserat på 4 recensioner. Har du en fråga om CDA KA71SS eller vill du ställa frågor till andra användare av produkten? Ställ en fråga
Sida 1/4

www.cda.eu
Stainless Steel
Sinks
Installation

2
Installation
Before installation
Oer up the sink to the worktop and/or the cabinets to confirm that
the external dimensions of the bowls are compatible with the cabinets
themselves.
Confirm that with the sink in position:
• There is adequate space to install any taps or other required
accessories.
• There is adequate space to install the waste pipework and that any
necessary modification to internal shelves to accommodate the waste
(and trap) is acceptable.
• Access to any water stop-cock or other services will still be adequate
after the installation.
Installation
• Use the template included with the sink to mark out where the
worktop needs to be cut.
• After cutting out the worktop aperture, we recommend you seal the
cut edges with silicone (or similar) sealant to help prevent ingress of
water.
• Position the supplied gasket around the perimeter of the hole (Fig. 1).
• It is often easier to mount the taps,
waste-fitting and overflow onto the sink
prior to fitting the sink to the worktop.
• Ensure that the external edge of the
sink is positioned on the gasket, to
create a barrier to the ingress of water
and other items between sink and
worktop.
Fig. 1

3
E & O E. All instructions, dimensions and illustrations are provided for guidance only. CDA reserve the
right to change specifications without prior notice.
• After positioning the sink on the
worktop, position the fixing brackets
as shown in Fig. 2, then tighten their
screws.
• Do not use a power tool to tighten
the screws; by using a hand tool
it is easier to ensure that they are
tightened just enough to clamp
down on the worktop and no more.
• After fixing, remove any excess gasket material with a suitable
cutter.
• We recommend a thin bead of silicone sealer is applied around the
perimeter as added protection against water ingress.
• The taps, waste-fitting and overflow can now be mounted onto the
sink (if not already done) and fully connected to their respective
services.
• To check the waste for leaks, close the plug/basket of the waste
fitting, open the tap and fill the sink to the level of the overflow; turn
o the tap and wait several minutes to verify that the water doesn’t
drain away.
• Empty the sink.
After fitting, ensure that the enclosed “Stainless Steel Sinks Use and
Maintenance” guide is retained for the customer and/or user of the
sink.
Fig. 2
Produktspecifikationer
Varumärke: | CDA |
Kategori: | Sjunka |
Modell: | KA71SS |
Behöver du hjälp?
Om du behöver hjälp med CDA KA71SS ställ en fråga nedan och andra användare kommer att svara dig
Sjunka CDA Manualer
8 September 2024
8 September 2024
4 September 2024
4 September 2024
4 September 2024
4 September 2024
3 September 2024
3 September 2024
3 September 2024
3 September 2024
Sjunka Manualer
- Tot Mate
- Kohler
- Eagle Group
- Blaupunkt
- Fulgor Milano
- Nodor
- Atosa
- Oliveri
- Foster
- Saro
- Elkay
- Sani-Lav
- Leisure
- Shaws
- Schock
Nyaste Sjunka Manualer
9 April 2025
8 April 2025
8 April 2025
2 April 2025
31 Mars 2025
30 Mars 2025
26 Mars 2025
4 Mars 2025
3 Mars 2025
28 Januari 2025