Dormakaba HSW-ISO Bruksanvisning
Sidor 10 Engelska Inte kategoriserad
Läs bruksanvisningen för Dormakaba HSW-ISO gratis online eller ladda ner PDF:en. Bruksanvisningen har visats 41 gånger. Fråga om modellen? Ställ en fråga

HSW-ISO Installation Instructions
Track rail 72 x 75 mm
1. Ceiling substructure for track rail and installation of the track rail:
The track rail must be bolted over its entire length (including the stacking track area) to a correctly
aligned, horizontal (longitudinally and transversely) substructure (e.g. DORMA substructure system).The
substructure should be designed to accommodate the total weight of all the panels both in the stacking
area and in the partition section.
The fixing point intervals for mounting the track rail to the substructure should be approx. 300 mm
along the straight sections and approx. 100 mm in the stacking area.
Caution: All the track joints must be provided with connection pins (a) in order to ensure a flush
transition between the track sections and thus smooth sliding panel operation.
(Fig. 1)
a
Fig. 1
2. Preparing the floor (Fig. 2):
The floor must be smooth and continuous to ensure full-facial contact with the bottom seal.
A lip should also be provided to repel driving wet.
DORMA-Glas800.52.121.6.32Stand/Issue 01/03Seite/Page 1/10
Produktspecifikationer
| Varumärke: | Dormakaba |
| Kategori: | Inte kategoriserad |
| Modell: | HSW-ISO |
Behöver du hjälp?
Om du behöver hjälp med Dormakaba HSW-ISO ställ en fråga nedan och andra användare kommer att svara dig