Enphase IQ 7+ Bruksanvisning
                    Enphase
                    
                    Inte kategoriserad
                    
                    IQ 7+
                
                                
    Läs gratis den bruksanvisning för Enphase IQ 7+ (5 sidor) i kategorin Inte kategoriserad. Guiden har ansetts hjälpsam av 26 personer och har ett genomsnittsbetyg på 5.0 stjärnor baserat på 13.5 recensioner. Har du en fråga om Enphase IQ 7+ eller vill du ställa frågor till andra användare av produkten? Ställ en fråga
                        Sida 1/5
                    
                    
                    
 Q U I C K   I N S T A L L   G U I D E 
Installing Enphase IQ 7, IQ 7+   IQ 7X and Microinverters
To install Enphase IQ Series Microinverters, read and follow all warnings and instructions in this guide and in the Enphase IQ 7 and IQ 7+ Microinverter 
Installation and Operation Manual at:  . Safety warnings are listed on the back of this guide.enphase.com/support
The Enphase Microinverter models listed in this guide do not require grounding electrode conductors (GEC) or equipment grounding conductors (EGC). 
The microinverter has a Class II double-insulated rating, which includes ground fault protection (GFP). To support GFP, use only PV modules equipped 
with DC cables labeled   or  .PV Wire PV Cable
IMPORTANT: Enphase IQ Series Microinverters require the Q Cable and are not compatible with previous Enphase cabling. An Envoy-S is required 
to monitor performance of the IQ Microinverters. The Q Accessories work only with Enphase IQ Series Microinverters.
D )  Check that you have these other items:
•  An AC junction box.
•  Tools: screwdrivers, wire cutter, voltmeter, torque wrench, 
sockets, and wrenches for mounting hardware
•  Field Wireable Connectors (Q-CONN-R-10M and Q-CONN-R-10F 
for single phase Q Cable or Q-CONN-3P-10M and Q-CONN-
3P-10F for multiphase Q Cable): optional male and female 
connectors.
E )  Protect your system with lightning and/or surge suppression 
devices. It is also important to have insurance that protects 
against lightning and electrical surges. 
F )  Plan your AC branch circuits to meet the following limits for 
maximum number of microinverters per branch when protected 
with a 20-amp over-current protection device (OCPD). For 
multiphase installations, use a 3-pole 20A OCPD.
Maximum* IQ Micros per AC branch circuit
IQ 7 Micros IQ 7+ Micros IQ 7X Micros
Single-phase 16 13 12
Multiphase 48 39 36
* Limits may vary. Refer to local requirements to dene the 
number of microinverters per branch in your area.
G )  Size the AC wire gauge to account for voltage rise. Select the 
correct wire size based on the distance from the beginning of the 
Enphase Q Cable to the breaker in the load center. Refer to the 
Voltage Rise Technical Brief at   for more enphase.com/support
information. 
   Center-feed the branch circuit to minimize voltage Best practice:
rise in a fully-populated branch. 
AC connector
Enphase 
IQ Series Micro
DC connector
AC junction box/isolator
terminator
Enphase 
Q Cable
Tie wraps or 
cable clips
Enphase 
disconnect 
tool
PREPARATION
A )  Download the Enphase Installer Toolkit mobile app and 
open it to log in to your Enlighten account. With this app, 
you can scan microinverter serial numbers and connect 
to the Enphase Envoy-S to track system installation 
progress. To download, go to   or enphase.com/toolkit
scan the QR code at right.
B )  Refer to the following table and check PV module compatibility at: 
enphase.com/en-us/support/module-compatibility.
Model DC connector PV module cell count
IQ7-60-2-INT MC-4 locking type Pair only with 60-cell modules.
IQ7PLUS-72-2-INT MC-4 locking type Pair with 60- or 72-cell modules.
IQ7X-96-2-INT MC-4 locking type Pair only with 96-cell modules.
C )  In addition to the Enphase Microinverters, PV modules and racking, 
you will need these  :Enphase items
•  An Enphase Envoy-S (model ENV-S-WM-230 or ENV-S-WB-230-F/G/I) 
communications gateway is required to monitor solar production and 
may be required to propagate a grid prole to the microinverters.
 NOTE: Depending on your region, IQ Series Microinverters may not 
produce until an Envoy-S is installed and congured with the appropri-
ate grid prole. See the Envoy-S Quick Install Guide for details.
•  Enphase Q Relay, single phase (Q-RELAY-1P-INT) or Enphase Q Relay, 
multiphase (Q-RELAY-3P-INT).
•  Tie wraps or cable clips (ET-CLIP-100) - works with both multiphase 
and single-phase cable
•  Enphase Sealing Caps (Q-SEAL-10): for any unused connectors on 
the Enphase Q Cable
•  Enphase Terminator (Q-TERM-R-10 for single phase or Q-TERM-
3P-10 for multiphase): one for each AC cable segment end.
•  Enphase Disconnect Tool (Q-DISC-10) 
•  Enphase Q Cable for single-phase or multiphase:
Cable model Connector  
spacing*
PV module  
orientation
Connectors  
per box
Single-phase
Q-25-10-240 1.3m Portrait (all) 240
Q-25-17-240 2.0m 240Landscape (60- and 96-cell)
Q-25-20-200 2.3m Landscape (72-cell) 200
Multiphase
Q-25-10-3P-200 1.3m Portrait (all) 200
Q-25-17-3P-160 2.0m 160Landscape (60- and 96-cell)
Q-25-20-3P-160 2.3m Landscape (72-cell) 160
*Allows for 30 cm of cable slack.
Produktspecifikationer
| Varumärke: | Enphase | 
| Kategori: | Inte kategoriserad | 
| Modell: | IQ 7+ | 
Behöver du hjälp?
Om du behöver hjälp med Enphase IQ 7+ ställ en fråga nedan och andra användare kommer att svara dig
Inte kategoriserad Enphase Manualer
                        
                         21 September 2024
                        
                    
                                                            
                        
                         4 September 2024
                        
                    
                                                            Inte kategoriserad Manualer
- Elcom
 - Sicce
 - Ei Electronics
 - Elektrobock
 - Cocraft
 - Trezor
 - Gerber
 - PATLITE
 - Landmann
 - Sonel
 - Hansa
 - Jata
 - Vevor
 - EAT
 - Intertechno
 
Nyaste Inte kategoriserad Manualer
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025
                        
                    
                                                            
                        
                         9 April 2025